Law Building, New College

The Client required 4 new classrooms with 30 computers in each classroom; a games room for students; and staffroom; a new fire escape route; and a new faith room and modifications to upgrade the capacity of their server room.

The client’s exact needs were fine-tuned during a series of design meetings and workshops to ensure the proposed scheme met their teaching needs.

Due to the increased student capacity of the building, an instruction was issued to convert the existing admin office to provide 10 new toilets and a cleaner’s cupboard.  This necessitated the construction of a new external drainage connection from the new toilets to the Yorkshire Water sewer in the main road.  (This was approximately 100m in length).  All additional works were completed within the contract period.

  • Duration / weeks29
  • Project value£1.5m
  • LocationPontefract
  • CustomerThe New College Collaborative Learning Trust

Other projects

Get in touch

If you would like to find out more about the work we do or talk to us about potential projects, we would love to hear from you.

Contact our team