Refurbishment and Alterations to Park House Lane
Duration // 24 Weeks

Refurbishment and Alterations to Park House Lane.

Location // Sheffield

Nu Construction have been awarded the refurbishment of CML’s existing warehouse at Sheffield.

The unit is located adjacent to the M1 motorway, in a predominantly industrial area on the outskirts of Sheffield.

The building comprises general warehouse area with attached office, which is to be adapted as part of the works to provide a new mezzanine at first floor along with raising the existing attached roof.

As part of the works, the existing office areas will need to be modified and extended internally to create additional office space along with board rooms, training rooms and welfare facilities with the existing stair infilled, new openings formed within existing walls and an additional second stairway created.

External refurbishment includes re-roofing the warehouse along with over cladding the office façade.

Latest Projects.

  • Liverpool//
  • National Farmers Union Mutual

2-8 Church Street

read more
  • Rotherham//
  • Parseq

Warehouse Extension

read more
  • Redditch//
  • Kettler (GB)

Warehouse Extension

read more
  • Heckmondwike//
  • LCP Properties

Unit 1 Retail Unit, Heckmondwike

read more
  • Durham//
  • Berendsen UK Ltd

Berendsen Artemis Court

read more
  • Leeds//
  • Aviva Life & Pensions Uk Ltd

Crown Point Retail Park

read more

Nu are led by an experienced and competent senior team who involve eliminating problems on a non-confrontational and non-contractual basis. Their attitude to recognising the importance of good management with regards to Health & safety is very evident.

  • Richard Green
  • Director
  • Spring&Co

Nu are led by an experienced and competent senior team who involve eliminating problems on a non-confrontational and non-contractual basis. Their attitude to recognising the importance of good management with regards to Health & safety is very evident.

  • Richard Green
  • Director
  • Spring&Co