Refurbishment and reconfiguration work is now complete at Victoria Primary Academy, Leeds for Wellspring Academy Trust.
The work included design and construction to convert external areas into internal areas to help the circulation within the school. The works comprised external windows, doors and glazing panels, specialist FF&E, structural steel connections and junctions, roof coverings and M&E Installations.
The nature of the refurbishment included the renewal of floor coverings, new ceilings, refreshed decorations, new fire doors, small new power and data installations throughout, new lighting, new heating system, renewal and creation of both pupil and staff/visitor toilet suites.