New Build Warehouse Extension, Wolverhampton

Commercial Body Fittings

DURATION: 33 weeks

Design and build of new 37,000 sq ft, 11m high steel portal frame powder coated warehouse extension.

The ground conditions were a challenge which included numerous deep mineshafts, worked coal seams, infill 1960's tip with waste up to 9m deep. The warehouse extension was designed to avoid any zone of influence from the mineshafts and an engineered solution in the ground proved a solution within the original budget was achievable.