Warehouse Extension
Duration // 40 Weeks

Warehouse Extension.

Location // Rotherham

Extension to existing building to provide 2500 m2 additional floor space.

Construction of an industrial assembly building with steel frame, metal roof and wall cladding; all on concrete slab
and pad foundations.

Parseq remained fully operational throughout the duration of the works.

This global engineering company is now benefiting from a fully operational facility

Latest Projects.

  • Liverpool//
  • National Farmers Union Mutual

2-8 Church Street

read more
  • Heckmondwike//
  • LCP Properties

Unit 1 Retail Unit, Heckmondwike

read more
  • Holme Valley//
  • Kirklees PCT

Holme Valley Hospital

read more
  • Rochdale//
  • Eric Wright Partnership Ltd

Kirkholt Medical Centre

read more
  • Leeds//
  • Aviva Life & Pensions Uk Ltd

Crown Point Retail Park

read more
  • Durham//
  • Berendsen UK Ltd

Berendsen Artemis Court

read more

Nu are led by an experienced and competent senior team who involve eliminating problems on a non-confrontational and non-contractual basis. Their attitude to recognising the importance of good management with regards to Health & safety is very evident.

  • Richard Green
  • Director
  • Spring&Co

Nu are led by an experienced and competent senior team who involve eliminating problems on a non-confrontational and non-contractual basis. Their attitude to recognising the importance of good management with regards to Health & safety is very evident.

  • Richard Green
  • Director
  • Spring&Co